1. User requirement specification
2. Risk assessment
3. Design qualification(DQ)
4. Installation qualification(IQ)
5. Operation qualification(OQ)
6. Performance qualification(PQ)
7. Factory acceptance test(FAT)
8. Site acceptance test(SAT)
9. Operation manual (OM)
10. Maintenance manual (MM)
11. Installation manual (IM)
12. Layout drawing
13. P&ID
14. Wiring drawing
15. Instruction for the main parts
16. Roughness Instrument detection at site
17. Pressure vessel document
18. Function and design specification (FDS)
19. Software design specification (SDS)
20. Hardware design specification (HDS)
21. Report for joints flaw detection
22. Instrument calibration certificate
23. Instrumentation data sheet
…